Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Ontario’s Deficit Shows Improvement, But Concerns Remain

Ontario’s Deficit Shows Improvement, But Concerns Remain

September 25, 2026
Brigil Set to Begin Major Three-Tower Project Soon

Brigil Set to Begin Major Three-Tower Project Soon

September 25, 2026
EllisDon Chosen for St. Thomas Gigafactory Project

EllisDon Chosen for St. Thomas Gigafactory Project

September 25, 2026
Netanyahu Flies Through Canada Amid Arrest Warrant

Netanyahu Flies Through Canada Amid Arrest Warrant

September 25, 2026
Motorcycle Crash Injures Woman in Oakville

Motorcycle Crash Injures Woman in Oakville

September 25, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»Ottawa»Brigil Set to Begin Major Three-Tower Project Soon
Views: 450
Ottawa

Brigil Set to Begin Major Three-Tower Project Soon

September 25, 20263 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Brigil Set to Begin Major Three-Tower Project Soon
Share
Facebook Twitter LinkedIn Pinterest Email
Ontario Construction News staff writer

Brigil, a real estate developer from Gatineau, is getting ready to kick off construction “shortly” on a significant mixed-use project at the location of Ottawa’s old Greyhound bus terminal, according to recent reports and documents from the City of Ottawa.

The 2.8-acre lot at 265 Catherine St. will be developed into a bustling residential and commercial area. Updated city planning records reveal that the approved plan includes 1,164 residential units across three tall towers standing at 32, 34, and 36 storeys high, complemented by two six-storey podiums and a section of three-storey townhouses facing Arlington Avenue.

The Ottawa Business Journal recently reported that Brigil intends to break ground on this site soon. Planning documents indicate that the development will unfold in two phases, starting with a 32-storey tower along Catherine Street that will offer around 423 apartments.

The second phase will involve building the remaining 34- and 36-storey towers along with seven townhouse units, which will add another 741 residential units. The layouts for these apartments will range from studios to three-bedroom homes, with Brigil committing to designating 100 units as affordable housing.

Aligning with Ottawa’s vision for transit-oriented, vibrant neighbourhoods within a short distance of services, this project emphasizes active transportation options. It will feature a two-level underground parking garage accommodating up to 667 vehicles – significantly below historical zoning limits – alongside provision for 1,193 bicycle parking spaces, which exceeds the city’s minimum requirement by more than double.

The city’s site plan approval report states that at least 20 percent of the space will be privately owned public areas. These spaces will include woonerf-style lanes, patios, gardens, and an approximately 1,000-sq. m. public plaza located at the northeast corner of the property complete with public restrooms. The ground-floor retail section is expected to host shops, eateries, and cafes to enhance street life.

Brigil acquired the site in early 2021 and demolished the vacant bus station that had been operating there since the ’70s in the following year.

Jessy Desjardins, Brigil’s vice-president of development, has consistently pointed out how this location can serve as a link between downtown Ottawa and the Glebe neighbourhood. During planning discussions with the Ottawa Business Journal he mentioned that opting for higher density would make commercial spaces more economically sustainable.

“When we look at the post-pandemic economic revival it’s going to be important that developers have a vision of encouraging local businesses to establish themselves,” Desjardins said. “By having a bit more density it allows us to reduce rents for those commercial spaces.”


Source link

Brigil construction Greyhound Massive Ottawa Ottawa News project shortly start Terminal threetower
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleEllisDon Chosen for St. Thomas Gigafactory Project
Next Article Ontario’s Deficit Shows Improvement, But Concerns Remain
admin
  • Website

Related Posts

Construction on Major Transit Line May Delay Travel in Ontario
Pickering

Construction on Major Transit Line May Delay Travel in Ontario

September 25, 2026
Wellington Gateway Project Moves to Final Stages
London

Wellington Gateway Project Moves to Final Stages

September 25, 2026
Ottawa Sees 55% Jump in New-Home Sales This August
Ottawa

Ottawa Sees 55% Jump in New-Home Sales This August

September 25, 2026
loader-image
Ottawa, CA
4:55 pm, Sep 25, 2026
temperature icon 24°C
clear sky
41 %
1024 mb
8 mph
Wind Gust: 0 mph
Clouds: 0%
Visibility: 10 km
Sunrise: 6:53 am
Sunset: 6:55 pm
Weather from OpenWeatherMap

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
Ontario’s Deficit Shows Improvement, But Concerns Remain

Ontario’s Deficit Shows Improvement, But Concerns Remain

September 25, 2026
Lake Ontario Adventure with MapQuest’s GM

Lake Ontario Adventure with MapQuest’s GM

September 25, 2026
Wellington Gateway Project Moves to Final Stages

Wellington Gateway Project Moves to Final Stages

September 25, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

✅

You're Subscribed!

Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.