Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Insights from Mark Carney at the Commonwealth Summit

Insights from Mark Carney at the Commonwealth Summit

November 3, 2026
Food Bank Visits Surge in Toronto Amid Rising Child Hunger

Food Bank Visits Surge in Toronto Amid Rising Child Hunger

November 3, 2026
Tragic Crash in Puslinch Claims Four Lives

Tragic Crash in Puslinch Claims Four Lives

November 3, 2026
Alert Issued for Loose Aggressive Dog in Oshawa

Alert Issued for Loose Aggressive Dog in Oshawa

November 3, 2026
Rookie Goalie Smith Stars in Frontenacs’ 4-1 Victory

Rookie Goalie Smith Stars in Frontenacs’ 4-1 Victory

November 3, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»Pickering»Ontario Considers Refurbishing Pickering Nuclear Facility
Views: 478
Pickering

Ontario Considers Refurbishing Pickering Nuclear Facility

November 3, 20264 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Ontario Considers Refurbishing Pickering Nuclear Facility
Share
Facebook Twitter LinkedIn Pinterest Email

Ontario is looking into upgrading an important nuclear facility, which could extend its operational life by another 30 years, in response to electricity demands that have “surprised” the government, according to the energy minister on Thursday.

The Pickering Nuclear Generating Station – which made up 14 percent of last year’s electricity generation – was scheduled for closure in 2025. However, the province is now requesting approval from the Canadian Nuclear Safety Commission to push that back to September 2026, as announced by Energy Minister Todd Smith.

Furthermore, Smith mentioned that the plant could still contribute power for many more years ahead, and Ontario has asked Ontario Power Generation to assess whether a refurbishment is feasible.

The Independent Electricity System Operator recently expressed confidence that it could address the electricity supply gap expected when Pickering goes offline – along with other units undergoing refurbishment – through new procurements that will significantly depend on natural gas in the near term.

However, Smith indicated that “unprecedented growth” in Ontario means there might be a need for Pickering’s substantial capacity for some time longer.

“I think that growth has surprised even Premier (Doug) Ford and our team,” he stated during a news conference on Thursday.

Smith highlighted recent developments like new electric vehicle and EV battery manufacturing entering the province, along with steel producers adopting electric arc furnaces.

“One of the things as we were exploring opportunities on how we fill that (supply) gap is we’ve got an existing asset here that has a proven track record of providing safe and reliable electricity and affordable electricity every day.. We have to be able to ensure that as we continue to see investment in our province, that the power is going to be there.”

Delaying Pickering’s shutdown for a year allows more time for new procurement generation sources to come online, Smith noted.

Interim NDP Leader Peter Tabuns argued that the government should have anticipated and planned for this supply gap much earlier.

“Premier Doug Ford failed to plan for Ontario’s energy needs and that’s put the province in a bind,” he said in a statement.

“The Conservatives cancelled and dismantled low-price renewable energy generation, then had to sign contracts last month to ramp up very expensive gas-fired power.”

The Progressive Conservatives removed a requirement established by the previous Liberal government mandating an update of Ontario’s long-term energy plan by February 2021. The most recent plan was released in 2017.

IESO forecasts indicate an increasing supply gap as electrification expands rapidly, especially within transportation.

Demand from growth in electric vehicles and public transportation electrification is predicted to surge significantly starting around 2035. By then, it’s expected there will be a projected gap of about 5,000 megawatts – enough power for five million homes – during summer months if all current power providers renew their contracts.

Long-term plans are focusing on incorporating more non-emitting resources into electricity generation portfolios including small modular nuclear reactors.

The Pickering Nuclear Plant is seen in an aerial image. (Kevin Frayer/The Canadian Press)

Smith also requested IESO provide insights on possibly halting new natural gas generation projects along with developing strategies aimed at achieving zero emissions within the electricity sector. The current dependence on natural gas implies rising greenhouse gas emissions from this sector

During Thursday’s announcement , Smith emphasized nuclear power’s emission-free characteristics. Keeping Pickering running until 2026 would cut emissions by approximately 2.1 million tonnes this year alone-equivalent to removing around 640 ,000 cars off roads , he explained.

He added keeping operations at Pickering would help preserve thousands of jobs temporarily.

Ken Hartwick , OPG’s president and CEO , confirmed that it’s safe for Pickering operate until 2026. In response inquiries regarding costs associated with extending its lifespan by one year , he stated it will ultimately benefit rate payers financially.

The Canadian Manufacturers and Exporters applauded potential refurbishments noting they would guarantee reliable energy access crucial industries like electric vehicle production , green steel manufacturing , essential minerals extraction while creating over one thousand jobs throughout construction phase renovations.



Source link

extend eyes life Nuclear Ontario Pickering Pickering news plans plant Refurbishment
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWolves GM and Players Chosen for CCHL Challenge
Next Article New Mayor from Brockville Takes Charge in Peterborough
Taylor Spencer
  • Website

Related Posts

Work Begins to Elevate Highway 5 Over Highway 6 in Waterdown
Hamilton

Work Begins to Elevate Highway 5 Over Highway 6 in Waterdown

November 3, 2026
Bruce Power Launches Unit 5 Life Extension Project
Sarnia

Bruce Power Launches Unit 5 Life Extension Project

November 3, 2026
Vandalism at Ontario Facility Linked to Israel
Peterborough

Vandalism at Ontario Facility Linked to Israel

November 3, 2026

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
Work Begins to Elevate Highway 5 Over Highway 6 in Waterdown

Work Begins to Elevate Highway 5 Over Highway 6 in Waterdown

November 3, 2026
Young Driver Charged Following Fatal Crash in South London

Young Driver Charged Following Fatal Crash in South London

November 3, 2026
Key Insights from London’s Local Election Outcomes

Key Insights from London’s Local Election Outcomes

November 3, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

✅

You're Subscribed!

Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.