Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Military Training Operations in Renfrew County

Military Training Operations in Renfrew County

September 5, 2026
Two Cars Set Ablaze in Richmond Hill

Two Cars Set Ablaze in Richmond Hill

September 5, 2026
Shooting Incident Claims Life in Northwestern Ontario Community

Shooting Incident Claims Life in Northwestern Ontario Community

September 5, 2026
Ontario Culture Days Features Over 1,500 Free Art Events

Ontario Culture Days Features Over 1,500 Free Art Events

September 5, 2026
Revised Proposal for Major Development in Mississauga

Revised Proposal for Major Development in Mississauga

September 5, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»Mississauga»Revised Proposal for Major Development in Mississauga
Views: 380
Mississauga

Revised Proposal for Major Development in Mississauga

September 5, 20263 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Revised Proposal for Major Development in Mississauga
Massive Mississauga development proposal revised in Ontario Land Tribunal settlement offer
Share
Facebook Twitter LinkedIn Pinterest Email
A rendering shows the previous plans for 5100 Erin Mills Parkway. Rendering: City of Mississauga submission

A significant development project in Mississauga has been updated as part of a settlement offer with the Ontario Land Tribunal.

This multi-phase development, set for 5100 Erin Mills Parkway near Erin Mills Town Centre, originally included nine towers between 20 and 44 storeys tall, totaling 3,162 residential units. Currently, the site houses restaurants, a Bouclair Home store, medical and dental offices, a pharmacy, and a Dollarama.

Earlier this year, the developer EMTC Holdings Inc. appealed to the Ontario Land Tribunal after city council did not make a decision regarding the official plan amendment and rezoning applications. The tribunal addresses disputes among individuals, developers, or municipalities over local planning matters like zoning bylaws and official plans.

This week, a spokesperson for Mississauga confirmed that city council has approved a settlement proposal that was submitted to the tribunal.

The new plan reduces building heights from 20-44 storeys down to 20-37 storeys.

The buildings along Glen Erin Drive will be limited to 25 storeys; there will be 20-storey structures at the northwest corner and 23-storey buildings along Erin Centre Boulevard. The tallest towers on-site will now reach heights of 35 and 37 storeys toward the back of the property.

According to the spokesperson, only two buildings now exceed Mississauga’s Official Plan maximum height limit of 25 storeys compared to five in the initial proposal.

The public park spanning 4,206 square metres has been moved from the back of the site to its northwest corner. This change offers better visibility and accessibility while allowing for synergies with nearby community facilities and schools.

The setbacks from public streets have been increased; buildings next to the park have also been reoriented to minimize shadow effects and create active frontages that integrate more seamlessly with open spaces.

Last 30 Days: 38,840 Votes

All Time: 1,503,348 Votes

1686 VOTES

After the storm damage at Rogers Stadium, do you feel safe attending an event there?

Setbacks from the park will now be nine metres wide to accommodate patios linked with non-residential areas while creating a pedestrian esplanade connecting both the park and a centrally located publicly accessible area leading into Erin Mills Town Centre.

The access points for vehicles will be streamlined through existing Ring Road routes instead of having new entry points off Erin Centre Boulevard or Glen Erin Drive as previously planned.

This revised traffic layout makes it easier for cars to navigate while cutting down on hard surfaces and enhancing pedestrian safety.

The agreement also adds around 2,047 square metres of non-residential commercial space-something that wasn’t included in earlier plans for retail or office use.

A draft plan for subdivision has been submitted aiming to create distinct blocks for future public streets along with public parks within this mixed-use development project.

A diagram shows phases and placement of buildings alongside a park. Diagram: City of Mississauga submission

An updated Master Plan outlines long-term goals for developing lands around Erin Mills Town Centre which includes both residential zones as well as commercial spaces alongside community resources like parks transit access roads-all future developments must submit separate planning requests according to what was stated by representatives from city hall...).()<(* )*^)*$(%.*)?)(%,),-(* )(.*?)))<(?!??|>|<).*?(?).*?)></[a-z])?(.*?)(</?[a-z]+)((?:[sS]*?)|(?:|/>)|s*)/gi);}
line Height=1; width=100%;} if (+ form ID){if (window._load Form) {_load Form(form ID);}}else{ throw new Error(“Missing form ID”);} })(j Query);is Enabled()) { echo ‘

‘; ?><link rel='stylesheet' type='text/css' href='get Asset Url(‘assets/editor. css’)); ?>’/><? php echo '
‘; } ?>      

Your account is currently inactive because your account is not verified yet.

  • INsauga’s Editorial Standards and Policies

    Stay informed!



    Source link

    development Land Massive Mississauga Mississauga news offer Ontario proposal revised settlement tribunal
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous Article$500,000 Fine for Maple Lodge Farms Following Worker Injury
    Next Article Ontario Culture Days Features Over 1,500 Free Art Events
    Casey Brooks
    • Website

    Related Posts

    Shooting Incident Claims Life in Northwestern Ontario Community
    Thunder Bay

    Shooting Incident Claims Life in Northwestern Ontario Community

    September 5, 2026
    Ontario Culture Days Features Over 1,500 Free Art Events
    St. Catharines

    Ontario Culture Days Features Over 1,500 Free Art Events

    September 5, 2026
    Remembering Tiina James, 79
    Obituaries

    Remembering Tiina James, 79

    September 5, 2026

    Subscribe to Updates

    Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

    loader

    At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

    We're social. Connect with us:

    Facebook X (Twitter) Instagram Pinterest YouTube
    Top Insights
    Betting on London’s Mayoral Race from Canada

    Betting on London’s Mayoral Race from Canada

    September 5, 2026
    AtomVie Unveils New Radiopharmaceutical Facility in Hamilton

    AtomVie Unveils New Radiopharmaceutical Facility in Hamilton

    September 5, 2026
    AtomVie Launches Advanced Radiomanufacturing Center in Hamilton

    AtomVie Launches Advanced Radiomanufacturing Center in Hamilton

    September 4, 2026
    Facebook X (Twitter) Instagram Pinterest
    • Home
    • About us
    • Contact us
    • DMCA
    • Disclaimer
    • Privacy Policy
    • Terms and Conditions
    © 2026 OntarioChronicle.

    Type above and press Enter to search. Press Esc to cancel.

    Subscribe to Updates

    Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

    loader

    ✅

    You're Subscribed!

    Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.