Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Government Backs Toronto AI Firm with Major Investment

Government Backs Toronto AI Firm with Major Investment

October 29, 2026
Oakville Collision Claims Life of 39-Year-Old Man

Oakville Collision Claims Life of 39-Year-Old Man

October 29, 2026
Aiden Pleterski Convicted of Fraud in Toronto Trial

Aiden Pleterski Convicted of Fraud in Toronto Trial

October 29, 2026
Fire Breaks Out in Burlington Townhouse, No Injuries Reported

Fire Breaks Out in Burlington Townhouse, No Injuries Reported

October 29, 2026
Cho Responds to Promotion Amid Expense Controversy

Cho Responds to Promotion Amid Expense Controversy

October 29, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»Toronto»Major Progress for Rekai Centre at Cherry Place
Views: 1858
Toronto

Major Progress for Rekai Centre at Cherry Place

October 8, 20263 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Major Progress for Rekai Centre at Cherry Place
Share
Facebook Twitter LinkedIn Pinterest Email

Ontario Construction Report staff writer

The construction of the 348-bed Rekai Centre at Cherry Place in Toronto’s West Don Lands has reached grade, celebrating a significant milestone for this 255,000-sq. ft. long-term care and healthcare facility.

This 13-storey building is being created as a Campus of Care that will bring together long-term care, healthcare services, education, and community resources in the developing waterfront area, just steps away from Corktown Commons Park.

Multiplex is serving as the general contractor while Montgomery Sisam is the design architect. The Rekai Centres is the owner of the project.

“George Brown Polytechnic is pleased to partner with The Rekai Centres on a new Education Centre,” said Dr. Gervan Fearon, President, George Brown Polytechnic. “By bringing education and practice together, we can provide our students with meaningful experiential learning while contributing to the development of a skilled healthcare workforce and strengthening care in our communities.”

The project aims to open its doors in 2028 and will feature 348 long-term care beds, including 96 dedicated for individuals living with Alzheimer’s disease and dementia along with 22 beds in Rekai’s Rainbow Wing that supports members of the 2SLGBTQI+ community and their allies.

The facility will also have specific floors for dementia care, an Infection Control Zone, and a dialysis clinic.

A new Education Centre is being developed through a partnership between The Rekai Centres and George Brown Polytechnic to provide healthcare students with practical training in an active long-term care setting. This program will help train Personal Support Workers, registered nurses, and other healthcare professionals.

This collaboration builds on an existing relationship between George Brown Polytechnic and The Rekai Centres aimed at linking education with clinical practice while working towards enhancing the healthcare workforce.

Life Labs will manage a ground-floor Patient Service Centre within the facility which will offer laboratory and diagnostic services to both Rekai residents and local community members.

This project has support from the Building Ontario Fund and is part of broader developments taking place in West Don Lands as well as along the waterfront area.

Peter Rekai, chair of the board of directors at The Rekai Centres stated that this initiative seeks to establish an integrated model of care enabling individuals to age within their own communities.

George Brown Polytechnic president Gervan Fearon mentioned that this Education Centre will provide students valuable hands-on experiences while fostering growth within the healthcare workforce.

Waterfront Toronto chief development officer Meg Davis pointed out that this project will enhance both healthcare services and senior-care offerings within this expanding community.

The project team includes contributions from Building Ontario Fund, Waterfront Toronto, George Brown Polytechnic as well as Life Labs.

The Rekai Centre at Cherry Place is expected to be finalized and ready for residents by 2028.


Source link

Centre cherry Don Grade lands Place reaches Rekai Toronto Toronto news Torontos west
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleSt. Thomas Welcomes Vianode’s $3.2B Investment
Next Article Canada Offers $2 Billion in Heat Pump Rebates
Alex Thornton
  • Website

Related Posts

Aiden Pleterski Convicted of Fraud in Toronto Trial
Toronto

Aiden Pleterski Convicted of Fraud in Toronto Trial

October 29, 2026
Direct Flights from Toronto to Mumbai Announced by Air India
Toronto

Direct Flights from Toronto to Mumbai Announced by Air India

October 29, 2026
Fire Erupts at Arva Recycling Center, Road Reopens
London

Fire Erupts at Arva Recycling Center, Road Reopens

October 29, 2026
loader-image
Toronto, CA
4:50 pm, Oct 29, 2026
temperature icon 20°C
light rain
70 %
1013 mb
10 mph
Wind Gust: 0 mph
Clouds: 100%
Visibility: 10 km
Sunrise: 7:49 am
Sunset: 6:13 pm
Weather from OpenWeatherMap

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
CPKC Holiday Train Schedule for Ontario 2026: Hamilton and Milton

CPKC Holiday Train Schedule for Ontario 2026: Hamilton and Milton

October 29, 2026
Mayor Josh Morgan’s New Term: Three Promises to Keep an Eye On

Mayor Josh Morgan’s New Term: Three Promises to Keep an Eye On

October 29, 2026
Fire Erupts at Arva Recycling Center, Road Reopens

Fire Erupts at Arva Recycling Center, Road Reopens

October 29, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

✅

You're Subscribed!

Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.