Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Major Contract for New Ottawa Science Facility Awarded

Major Contract for New Ottawa Science Facility Awarded

August 12, 2026
Vaughan Massage Therapist Arrested for Assault

Vaughan Massage Therapist Arrested for Assault

August 12, 2026
Coyote Bites Toddler in Whitby Playground Incident

Coyote Bites Toddler in Whitby Playground Incident

August 12, 2026
New Funding for First Nations Energy Projects

New Funding for First Nations Energy Projects

August 12, 2026
Funding Boosts Energy Access and Jobs for First Nations

Funding Boosts Energy Access and Jobs for First Nations

August 12, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»Richmond Hill»New Civic Square Begins Construction in Richmond Hill
Views: 288
Richmond Hill

New Civic Square Begins Construction in Richmond Hill

August 12, 20263 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
New Civic Square Begins Construction in Richmond Hill
Richmond Hill breaks ground on new Dave Barrow Civic Square
Share
Facebook Twitter LinkedIn Pinterest Email
Ontario Construction News staff writer

Construction is now underway for a new all-year public area next to Richmond Hill’s Central Library, as the City has officially started work on Dave Barrow Civic Square.

The Richmond Hill Council celebrated this important moment at the southwest corner of Yonge Street and Major Mackenzie Drive West, where the new park will be developed.

Designed by JRS, the park aims to create a unique public space where community members can come together for events, celebrations, and daily activities all year long.

This square will also act as an entrance to Richmond Hill’s historic Village area. The park’s plans feature the Richmond Hill Bowl and Bowl Stage, which includes an outdoor amphitheatre and a permanent stage for concerts, movies, and community shows.

A seasonal skating rink will be part of the park too; it will transform into an events lawn during spring, summer, and fall. There will also be an events plaza and terrace available for gatherings and activities.

The project will include natural spaces as another key element. The park plans feature woodlands, a pollinator meadow, a natural grass meadow, and a marsh that connect through new trails. A teaching garden will offer outdoor learning opportunities.

The design also features existing elements honoring Barrow, such as a memorial bench and his sandblasted quote: “It’s all about community.”

“Dave Barrow Civic Square will be a place where our community comes together, where neighbours become friends and where pride in Richmond Hill comes to life,” Mayor David West said.

“This is already one of our busiest corners next to our Central Library. Soon it will be a true gathering spot for residents to celebrate and connect throughout every season. I can’t think of a better way to honor Dave Barrow along with his words that resonate with his years of service: ‘It’s all about community.’”

Barrow dedicated over 30 years to serving Richmond Hill, including his role as mayor from 2006 to 2021.

The civic square was first dedicated in September 2022. The park plan was created with input from the community and received approval from Richmond Hill Council on March 26, 2025.

Construction is anticipated to happen from summer 2026 until late 2027.

Once finished, Dave Barrow Civic Square will become Richmond Hill’s sixth destination park-a major public gathering space combining event infrastructure, recreation facilities, and natural areas right in the heart of the community.

You can find more information about this project through the City of Richmond Hill’s Parks Projects program at Richmond Hill. ca/Parks Projects.


Source link

Barrow breaks civic Dave ground Hill Richmond Richmond Hill Richmond Hill news Square
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleHotel Room Shortage Impacts Medical Travelers in Thunder Bay
Next Article Remembering Teresa Gough
Lauren Chen
  • Website

Related Posts

Fire at Richmond Hill Prompts Police Investigation
Richmond Hill

Fire at Richmond Hill Prompts Police Investigation

August 11, 2026
Tragic Daycare Accident Claims Life of Toddler
Richmond Hill

Tragic Daycare Accident Claims Life of Toddler

August 9, 2026
Fire Claims Life in Brampton Home
Brampton

Fire Claims Life in Brampton Home

August 9, 2026

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
Kelowna and London, Ontario Begin Cultural Collaboration

Kelowna and London, Ontario Begin Cultural Collaboration

August 12, 2026
Black Soot in Hamilton Found to Contain Harmful Chemicals

Black Soot in Hamilton Found to Contain Harmful Chemicals

August 11, 2026
Local Councillor Pushes for Review of AI Data Centre Effects

Local Councillor Pushes for Review of AI Data Centre Effects

August 11, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

✅

You're Subscribed!

Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.