A multi-year effort to “refresh and revitalize” Whitby’s main street is looking for more public input.
The town has already gathered insights from over 580 residents during the first phase of engagement regarding the redesign of Brock Street. They have also put together a draft concept design for the transformation of Whitby’s main north-south road, stretching from the Highway 401 exit to just north of the CP rail tracks near Maple Street.
The suggested design for this three-plus kilometer stretch includes plans for traffic calming, outdoor patios, accessible on-street parking, wider sidewalks, improved lighting, trees, and more. It also includes a proposal for a roundabout at the intersection of Brock Street and Burns Street to aid in traffic calming.
Residents have until October 9 to review the design concept and complete a survey to express whether it aligns with their “vision” for the street.
An open house will take place next week at the Centennial Building’s Regal Room (416 Centre Street) on Wednesday, September 24 between 1 p. m. and 3 p. m., as well as from 5 p. m. to 7 p. m., where people can drop in to learn more about the project and provide feedback on key aspects.
The draft concept design supports the Community Strategic Plan’s objective of “revitalizing downtowns to strengthen community connections, encourage active transportation and support local business.”
Feedback collected will be shared with Whitby Town Council to guide future budget planning and final design decisions.
For more information, visit connectwhitby. ca/Brock Street
INsauga’s Editorial Standards and Policies
Last 30 Days: 46,163 Votes
All Time: 1,447,723 Votes
913 VOTES
Source link
Source link









