Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • Smiths Falls
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Delivery Van Theft Suspect Arrested in Toronto

Delivery Van Theft Suspect Arrested in Toronto

January 10, 2026
B.C. Evaluating the Removal of Four Trutch Namesakes

B.C. Evaluating the Removal of Four Trutch Namesakes

January 10, 2026
Things Happening This Weekend in Durham Region

Things Happening This Weekend in Durham Region

January 10, 2026
Hugh Clarkson Remembered

Hugh Clarkson Remembered

January 10, 2026
Hotel Worker Assaulted in Hate-Driven Incident

Hotel Worker Assaulted in Hate-Driven Incident

January 10, 2026
Facebook Instagram
Facebook Instagram
Ontario Chronicle: Latest Ontario News, Local InsighsOntario Chronicle: Latest Ontario News, Local Insighs
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • Smiths Falls
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario Chronicle: Latest Ontario News, Local InsighsOntario Chronicle: Latest Ontario News, Local Insighs
Home » Port Elgin » Road Work Kicks Off in Port Elgin Next Week
Views: 683
Port Elgin

Road Work Kicks Off in Port Elgin Next Week

January 9, 20262 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
Road Work Kicks Off in Port Elgin Next Week
Share
Facebook Twitter LinkedIn Pinterest Email
Drivers passing through downtown Port Elgin should get ready for some delays starting next week.

The first phase of the Ministry of Transportation’s Connecting Link Program will start road repair work on Goderich Street (Highway 21) on Monday. The section of road between Concession 6 and Concession 10 will be resurfaced, its historic brick intersections restored, and some minor underground infrastructure improvements made.

This initial phase includes replacing underground services and interlocking bricks at the intersections of Gustavus Street and Green Street.

Following that, the second phase will commence on May 19 with further underground service replacements and interlocking brick work at the intersections of Mill Street and Elgin Street, along with new asphalt laid down between Market Street and Emma Street.

Each of these first two phases is anticipated to take around four to five weeks to finish.

The downtown project is prioritized so it can be completed before the peak tourism season kicks in.

A schedule for the remaining three phases hasn’t been announced yet. Phases 3 through 5 will involve paving and replacing underground infrastructure along Goderich Street from Ivings Drive to Concession 6, as well as sections from Emma Street to Concession 6, and Market Street to Concession 10. The public will be informed once specific start dates are set.

Goderich Street will be closed in segments while underground services are put in place. Detour routes have been arranged to help drivers navigate around the construction. Pedestrians will still have access to downtown businesses throughout this time, and alternate parking areas will be available.


Source link

downtown Elgin phase Port Port Elgin Port Elgin news Road starts Week work
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleDavid Sawyer, 70, Has Passed Away
Next Article Trucker Faces Charges for Overloaded Logs
Avatar of Taylor Spencer
Taylor Spencer
  • Website

Related Posts

LRT Service to Downtown Cambridge Gets Green Light
Waterloo

LRT Service to Downtown Cambridge Gets Green Light

January 10, 2026
Early Voting Now Available in Grey Bruce for Ontario Election
Port Elgin

Early Voting Now Available in Grey Bruce for Ontario Election

January 10, 2026
Discover the Joy of the Horton Christmas Market
St Thomas

Discover the Joy of the Horton Christmas Market

January 10, 2026

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
Inside the Home of a Bridal Makeup Artist in Heated Rivalry

Inside the Home of a Bridal Makeup Artist in Heated Rivalry

January 10, 2026
Shopping for a Carbon Monoxide Alarm with Kitchener Fire Department

Shopping for a Carbon Monoxide Alarm with Kitchener Fire Department

January 10, 2026
Ice Storm Causes Widespread Power Outages in Southwestern Ontario

Ice Storm Causes Widespread Power Outages in Southwestern Ontario

January 10, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.