Close Menu
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
What's Hot
Ontario Students Face New Education Policy Changes This Year

Ontario Students Face New Education Policy Changes This Year

September 8, 2026
London Transit Project Moves Forward with Bre-Ex Contract

London Transit Project Moves Forward with Bre-Ex Contract

September 8, 2026
What’s Open in Ottawa for Labour Day?

What’s Open in Ottawa for Labour Day?

September 8, 2026
Remembering Bill Harrison

Remembering Bill Harrison

September 8, 2026
Serious Crash in Port Elgin Under Investigation

Serious Crash in Port Elgin Under Investigation

September 8, 2026
Facebook Instagram
Facebook Instagram
Ontario ChronicleOntario Chronicle
Subscribe
  • Home
  • London
  • St Thomas
  • Toronto
  • Oakville
  • Ottawa
    • Hamilton
    • Richmond Hill
    • Vaughan
    • Windsor
    • Simcoe
    • St. Catharines
    • Thunder Bay
    • Tillsonburg
    • Vaughan
    • Wasaga Beach
    • Waterloo
    • Whitby
    • Windsor
    • Hamilton
    • Kitchener
    • Oakville
    • Ottawa
    • Perth
    • Peterborough
    • Pickering
    • Port Elgin
    • Renfrew
    • Richmond Hill
  • Contact us
Ontario ChronicleOntario Chronicle
Home»London»London Transit Project Moves Forward with Bre-Ex Contract
Views: 316
London

London Transit Project Moves Forward with Bre-Ex Contract

September 8, 20262 Mins Read
Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
London Transit Project Moves Forward with Bre-Ex Contract
Share
Facebook Twitter LinkedIn Pinterest Email
Ontario Construction News staff writer

The final phase of London’s Wellington Gateway rapid transit project has kicked off, with Bre-Ex Construction Inc. landing a $50.4-million contract for the job.

The local contractor received the Phase 2B contract on June 23 after presenting the lowest of four bids. Bre-Ex’s bid came to $50,416,071.33, not including HST.

L82 Construction Ltd. offered the second-lowest bid at $50,920,815.30, while J-AAR Civil Infrastructures Ltd. followed at $54,686,849.73 and KAPP Infrastructure Inc. at $56,978,778.

This final phase includes work on Wellington Road between Watson Street and just south of Base Line Road East.

Construction started on August 31 and will wrap up the essential major work needed for the Wellington Road rapid transit corridor.

The project features widening and reconstructing Wellington Road, setting up two center-running transit lanes, and building new rapid transit stations.

Crews will also take care of replacing underground infrastructure like watermains and sewers along with completing electrical work, communications upgrades, traffic signals improvements, landscaping efforts, streetscape enhancements, plus pedestrian and cycling upgrades.

Initially, construction will focus on the area north of Whetter Avenue before moving south toward Base Line Road East later in 2027.

Phase 2B is projected to carry on through 2029 with some finishing touches extending into 2030. The City has also granted a separate contract worth up to $4.8 million to Dillon Consulting Ltd. for overseeing construction inspection and managing contracts.

This project further entails making improvements to the Wellington Road S-curve between Weston Street and Moore Street where road realignment will occur as part of these upgrades.

Wellington Gateway stands as one of London’s three rapid transit corridors. The overall project encompasses dedicated transit lanes along with enhanced pedestrian and cycling routes while upgrading underground infrastructure over roughly six kilometers of Wellington Road and Wellington Street.

To ensure traffic flow during construction stages on Wellington Road remains smooth, at least one lane in each direction will stay open while access to Victoria Hospital as well as local businesses and properties is maintained.

This last phase comes after earlier segments of the Wellington Gateway project that are close to completion.


Source link

50.4million BreEx final London London News phase project rapid starts Transit
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleWhat’s Open in Ottawa for Labour Day?
Next Article Ontario Students Face New Education Policy Changes This Year
admin
  • Website

Related Posts

What’s Open and Closed in London for Labour Day
London

What’s Open and Closed in London for Labour Day

September 8, 2026
Tornados Hit Windsor and Wheatley on Thursday
Windsor

Tornados Hit Windsor and Wheatley on Thursday

September 7, 2026
New Developments in Ontario Liberal Leadership Contest
Toronto

New Developments in Ontario Liberal Leadership Contest

September 7, 2026
loader-image
London
11:42 am, Sep 8, 2026
temperature icon 23°C
broken clouds
67 %
1024 mb
7 mph
Wind Gust: 0 mph
Clouds: 80%
Visibility: 10 km
Sunrise: 6:57 am
Sunset: 7:48 pm
Weather from OpenWeatherMap

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

At Ontario Chronicle, we are dedicated to bringing you the latest news and updates from across the vibrant cities of Ontario, Canada. From the bustling streets of Brampton to the serene landscapes of Burlington, from the cultural hub of Hamilton to the historic charm of London.

We're social. Connect with us:

Facebook X (Twitter) Instagram Pinterest YouTube
Top Insights
London Transit Project Moves Forward with Bre-Ex Contract

London Transit Project Moves Forward with Bre-Ex Contract

September 8, 2026
Brampton Landlord Sentenced After Tragic Fire Incident

Brampton Landlord Sentenced After Tragic Fire Incident

September 8, 2026
What’s Open and Closed in London for Labour Day

What’s Open and Closed in London for Labour Day

September 8, 2026
Facebook X (Twitter) Instagram Pinterest
  • Home
  • About us
  • Contact us
  • DMCA
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
© 2026 OntarioChronicle.

Type above and press Enter to search. Press Esc to cancel.

Subscribe to Updates

Stay updated with the latest news and exclusive content from Ontario Chronicle, delivered straight to your inbox. Sign up now and never miss a story!

loader

✅

You're Subscribed!

Thanks for subscribing to Ontario Chronicle. You'll start receiving updates shortly.