Most popular Area
How does this work?
An inventive rendering of the proposed constructing.
A constructing challenge that has been thought of in Burlington since 2021 is again on the desk with a brand new plan.
The proposed constructing is at 276, 284 and 292 Plains Street East between Filmandale Street and Shadeland Avenue in Aldershot.
The challenge, presently going via the planning course of on the Metropolis of Burlington, requires a 7-storey constructing with 141 dwelling models with a mixture of one, two and three bedrooms.
If the challenge proceeds it can additionally embody 153 parking areas of which 100 shall be underground. There shall be room for 71 bicycle parking areas. The highest ground will comprise the constructing’s mechanical system and amenity areas for the residents.
When the plan was first offered in 2021 it referred to as for 6-storeys and 117 models.
At present, there are unoccupied houses on the location which have been used for workplace and industrial functions.
A public assembly has been referred to as to debate the challenge additional.
The assembly will happen at Burlington Metropolis Corridor, at 9:30 a.m. on Might 13. It will also be considered on-line at www.burlington.ca.
Particulars on how he can communicate on the assembly may be discovered right here.
insauga’s Editorial Requirements and Insurance policies
promoting








