Bracebridge’s historic Silver Bridge shall be closed for the foreseeable future.
This week, the District of Muskoka closed the bridge to car and pedestrian site visitors after a structural evaluation.
Based on the district, City of Bracebridge workers encountered points on the bridge when clearing snow.
District workers attended the location and seen a shift within the bridge that was not beforehand current throughout its final inspection in November.
Based on the district, a senior structural engineer was introduced in to evaluate the shift and to find out the subsequent steps for repairs.
“We are being proactive to reduce the load on the bridge and safeguard both the public and this iconic infrastructure,” mentioned James Steele, Commissioner of Engineering and Public Works. “We know how important this bridge is to the community and its history, and so we’ll make extra efforts to keep everyone informed as we learn more and work on repairs.”
The Silver Bridge dates again to 1929 and has been an vital a part of the city’s historical past, serving as an iconic image of heritage and preservation.
There is no such thing as a timeline for when the bridge will reopen. The district is asking drivers and pedestrians to make use of various routes to entry the downtown space.









